Sergei Sobyanin describes how Leningradsky Station will look after its modernization

Modernization of Leningradsky Station is underway in the capital. Sergei Sobyanin, Mayor of Moscow, and Oleg Belozerov, General Director and Chairman of the Board of Russian Railways JSC, have inspected the progress of the work.
“We are implementing many projects together with Russian Railways, and building dozens of new stations in Moscow. Now it is the turn to the very first station in our country, Leningradsky. It was built in 1849. Since then it underwent a number of reconstructions. It is clear that life goes on, and demands change. And we in the Moscow City Government have decided to lease the station building from Russian Railways and carry out serious renovation work here. We are talking about restoring the historic building and renovating the new buildings — there are three of them, and — the biggest project — building canopies for passengers to walk from the trains directly into the square. The station square should be landscaped and cleared of excessive retail outlets. An additional entrance from the street through an underpass that has long been closed, and new entrances and exits to the Metro station will open. And the station itself will also be renovated. In this way we will triple the space for passengers and double the number of seats. All in all, of course, it will become a comfortable and modern space. I hope that by the end of the year all the main work will be completed,” said Sergei Sobyanin.
The Mayor of Moscow also thanked Russian Railways JSC for its assistance in the renovation of Leningradsky Station and expressed hope that the implementation of projects involving the reconstruction of the capital’s historic railway stations would continue in the future.
Oleg Belozerov, General Director and Chairman of the Management Board of Russian Railways JSC, thanked Sergei Sobyanin and his team for their fruitful cooperation in the development of Moscow’s railway infrastructure. According to him, a comprehensive approach to organizing the work of railway transport is being implemented in the capital. It is also necessary to coordinate the interaction of different elements of the transportation system, in particular automation. To improve its efficiency, new technologies are being developed and will be introduced at various sites, including Leningradsky Station.
“Thanks to our ability to develop new, complex solutions for Moscow, almost every new facility represents a step into the future. Here, at Leningradsky Station, new technologies will be practiced and options for passenger traffic will be developed during the year. It’s a major upgrade in terms of passenger convenience. Few people think about the fact that passenger flows need to be managed just like road traffic. What is more, in enclosed spaces controlling these flows can be even more complex. And together we and our city are finding a solution here. The station, of course, will be completely different — it won’t just be modern, it will be a glimpse into the future. There will be new elevators and co-working areas. Everything that we absolutely expect to see in modern buildings today,” Oleg Belozerov emphasized.
According to him, the best practices and technologies developed will then be applied in other regions of the country.
Located on Komsomolskaya Square, the Leningradsky railway station (previously, at different times, known as the Peterburgsky, Nikolayevsky and Oktyabrsky Station) is one of the most important transportation facilities of the capital. Sapsan, Lastochka and other long-distance and suburban trains regularly arrive in and depart from the station. They go to destinations including Saint-Petersburg, Murmansk, Vyborg, Veliky Novgorod, Zelenograd, Tver, Klin, Bologoye, Likhoslavl and Konakovo.
We plan to finish the main work by the end of 2025,” Sergei Sobyanin wrote in his Telegram channel.
Source: Sergei Sobyanin’s Telegram channel @mos_sobyanin











Leningradsky Station is part of the Three Stations Square transportation hub, which is used by more than 350,000 passengers daily. In addition to the three central stations (Leningradsky, Yaroslavsky and Kazansky), two Metro lines (Sokolnicheskaya and Koltsevaya), the second and fourth Moscow Central Diameter (MCD) railway lines and above-ground urban transport (electric and conventional buses and trams) routes all meet here.
By 2040 the total passenger traffic of the hub will increase by 40 percent to 500 thousand passengers per day. This will be made possible by the development of the MCD lines and the launch of traffic on the Moscow — Saint-Petersburg high-speed railway (HSR-1).
The new look of the old station
In order to create comfortable conditions for passengers that meet the high standards of Moscow’s transport system, a comprehensive modernization of Leningradsky Railway Station began last August. This will include the integration of the station into a single transport framework, and the organization of new exits and entrances to Metro stations, as well as the provision of additional space for passengers and replacement of infrastructure equipment and the repair of the roof and facades.
The historic section of the station building will be preserved and renovated. The key changes will affect the interior space — the station will become modern and convenient for all categories of passengers. By eliminating some of the redundant retail outlets, the space for passengers and greeters will be significantly increased.
After the modernization, the exit from the station building through the underground passage under Krasnoprudnaya Street, which had been closed for more than 30 years — since the 1990s, and a new, basement-floor level passage to Komsomolskaya Station, on the Sokolnicheskaya and Koltsevaya Metro lines, will be opened.
A new main entrance will be opened on the first floor on the side of the station square. The entrance in the historic part of the station will remain — it will be divided into three zones: two side ones for entry and a central one for exit.
By redistributing passenger flows and installing modern equipment, the waiting time in the screening areas will be reduced.
Two additional entrances to the Metro system have already been opened at Leningradsky Station. One of them is on the long-distance train platform. With the opening of this entrance the passage time to the Metro has been reduced by 80%, from five minutes to one minute. The second entrance is in the station square. Now commuter train passengers don not have to go round the station building to get to the Metro.
After the work is completed on the Metro, Leningradsky, Kazansky and Yaroslavsky stations will all be connected, so passengers will not need to go outside.
As part of the comprehensive modernization of Leningradsky Station, the utility and technical systems will be completely renewed. This applies not only to the systems within the building, but also to the systems that connect the station to the city’s utility and technical networks.
Special attention will be paid to creating a comfortable microclimate. In summer and winter, the temperature inside the station building will be kept at 22–25 degrees Celsius. This will be possible even if the temperature outside exceeds 40 degrees or drops below minus 40 degrees.
The volume of air circulating in the station building will be doubled. Before the renovation, there was no air conditioning on the basement floor, resulting in a stagnant, stale atmosphere which made it extremely uncomfortable to spend time there, especially during the hot season. During the modernization, the ventilation system will be updated so that every area of the station will be adequately supplied with fresh air.
The level of illumination will also double, to 400 lux. The ticket office will be decorated with modern skylights, which were previously hidden from the eyes of passengers.
The functional layout of the floors will also change. The main purpose of the first floor of the station will be to enable quick access to the platforms.
Given the growing popularity of online ticketing (over 90 percent of Sapsan passengers purchase tickets online), one of the two ticketing areas will be removed, freeing up additional space. This will not only optimize the service process, but will also provide for the creation of new areas, including for passengers to rest. There will be support services for passengers, including an updated children’s play area, a mother and child room, a medical center, and an information desk where passengers can learn about public transport and other city services.
The second and third floors will be reserved for passengers with longer waiting times, and will have comfortable seating areas and modern, affordable cafes and restaurants. Here passengers will be able to use the station’s library and co-working space and charge their mobile devices.
The area of the VIP lounges will also be doubled — they will be located on the first and second floors.
On the basement floor there will be shopping areas and luggage storage rooms (more than 1,500 lockers). In contrast to the previous single-size lockers, the new automated lockers will be able to accommodate luggage of any size, including bulky items, in compliance with all security standards.
The station will be equipped with modern information systems, including updated display boards and a digital passenger navigation system similar to the one in the Nizhegorodskaya Moscow Urban Interchange, and in Maryina Roshcha station on the Large Circle Line of the Moscow Metro. Digital multifunctional screens will display up-to-date information, including real-time train schedules and departure platform numbers.
A barrier-free environment will be created. There will be an additional elevator that will connect all floors of the building, including the basement floor. Previously, access to the upper levels was limited, which created difficulties for people with reduced mobility and passengers with children.
There will also be toilets on each floor. Previously, the only toilets were on the basement floor. The total number of toilets will increase sevenfold.
It is planned that the modernization of Leningradsky Station will be completed in late 2025 — early 2026.
175 years: the history of Moscow’s oldest railway station
In February 1842, Nicholas I signed a decree on the construction of the Saint-Petersburg-Moscow railway. The emperor personally assigned the design of the passenger terminals in the two cities to the great architect Konstantin Ton, who designed the Catherine Church in Saint-Petersburg, the Cathedral of Christ the Savior and the Grand Kremlin Palace in Moscow.
The stations in both capitals were built according to the same design: an austere two-story facade, and in the central part of the building — a two-tiered tower with a clock and a spire.
Moscow’s Peterburgsky Station was built in 1849. On the first floor of the building there was a spacious two-light lobby, passenger halls and imperial rooms, on the second floor there were service apartments for senior railway officials and technical specialists.
The first working train arrived from Saint-Petersburg to Moscow on August 3, 1851. On August 19, the railway was tested by Emperor Nicholas I himself with his wife, the heir to the throne, grand dukes, four German princes and courtiers. Regular passenger traffic along the first Russian railway line was opened on November 1, 1851. In 1855, after the accession to the throne of Emperor Alexander II, the Saint- Petersburg-Moscow railway became known as the Nikolayevskaya railway, and accordingly, the stations in Moscow and St. Petersburg were also named Nikolayevsky.
In February 1923, the Nikolayevskaya railway was renamed Oktyabrskaya, and the Nikolayevsky railway station was renamed Oktyabrsky. A year later, the Northern Capital itself was renamed, and the station accordingly became Leningradsky. It retains this name to this day, although the destination city is now called Saint-Petersburg.
In 1934, the first major modernization of the station building was carried out. The covered platform hall was demolished, a ticket office was built, and an information office, post office and telegraph office were added to the station.
In 1948–1950 the internal premises of the station were renovated to a design by architect A.N. Dushkin, and the interiors were redecorated.
In the 1970s Leningradsky Station underwent a major reconstruction in accordance with a design by architect V. I. Kuznetsov. Its area was noticeably increased: the layout of the building was redesigned, the building was extended, separate platforms were constructed, new station tracks were laid, and a third floor was added. The changes enabled the station to deal with the needs of increasing passenger traffic and helped to expand its functionality.
In 1974 the historical part of the station was accepted for state protection (Resolution of the Council of Ministers of the RSFSR No. 624 of December 4, 1974), and today it is classed as an object of cultural heritage of federal significance. The protected parts of the building include the clock tower with two semicircular balconies at the base, and a dome and spire, paired window openings with relied arch surrounds, pilasters, rectangular door panels, stucco rosettes, fluted columns, and a grand 19 th century cast-iron staircase, among other elements.
In August 1975, the upper and lower ticket offices opened. A spacious main hall was built in place of the landing stage. For the convenience of passengers, the station was connected by underground walkways to Metro stations.
In 1989–1997 the platforms were lengthened, canopies were built over the platforms, and lighting was improved. The layout of the station building was changed in order to prevent the crossing of passenger flows of different directions.
In 2008–2013, comprehensive repair and restoration works were carried out, which included the restoration of the original color of the facade and elements of the station’s decor.
10 Moscow railway stations
In addition to the Leningradsky station, Moscow has nine other long-distance railway stations for passenger transport: Kazansky and Yaroslavsky (1862), Belorussky (1870), Kursky (1896), Paveletsky (1900), Rizhsky (1901), Savyolovsky (1902), Kievsky (1918) and the youngest — Vostochny (2021).
More than 350,000 passengers use the central railway stations of Moscow every day. More than 150 long-distance trains depart every day. In 2024, the total passenger traffic of Moscow’s main stations totaled 117 million passengers, including 16 million (approximately 14 percent) at Leningradsky Station.
MCD passenger infrastructure development plans for 2025–2026
In accordance with the Central Transport Hub infrastructure development plan-schedule approved by Sergei Sobyanin and Oleg Belozerov, 15 different activities are to be implemented in 2025–2026, including the completion of construction and renovation of seven Moscow Urban Interchanges (MUI):
- Petrovsko-Razumovskaya MUI MCD-1 (platform No. 1 and concourse);
- Kursky Station (second and third platforms, tunnel) with a new station operation center and the launch of a digital management system;
- Moscow City MUI: MCD-1/MCD-4 (three platforms, northern concourse, integration of southern concourse with MCD-4);
- Serp & Molot MUI: MCD-2/MCD-4 (platforms and concourse integrated with Metro);
- Zhelezhodorozhnaya MUI: MCD-4 (platforms No. 3 and 4, north concourse, transit gallery with ramps to the platforms);
- Begovaya MUI: MCD-1/MCD-4 (three platforms and a lobby integrated with the Metro);
- Tsaritsyno MUI: MCD-2 (lobby integrated with the Metro).
In addition, it is planned to complete modernization of Leningradsky Station (passenger terminal building).
Plans also include completing the upgrade of rolling stock on the MCD and starting the upgrade of trains on the Yaroslavl line of Moscow Railway.
Today, 85 Moscow Urban Interchanges operate on the MCD, and on the Paveletsky and Yaroslavl lines of Moscow Railway. It is planned that another 67 Moscow Urban Interchanges will be constructed or renovated by 2035. This will bring their total number to over 150.